II. PAVEMENT ENGINEERING AND PAVING MATERIALS

2. FLEXIBLE PAVEMENT

A. ON GOING PROJECTS
6. Study to Prevent Reflecting Cracks on Bituminous Overlay over Cracked Concrete Pavement using Geotextile
Date of Start:

December 1999
Gujarat Engineering Research Institute, Vadodara, (R)

 

Present Status and Progress
The performance study of experimental stretches constructed using different techniques on Kim - Mandavi road is continued during the year. Experimental stretch was constructed in Jan -2000. Field performance evaluation study was carried out for 5 years.